Primary metals2025
Foundry throughput recovery
A fictional foundry case study: recovering casting-line capacity by fixing changeover and scrap, without a new furnace.
- Overall equipment effectiveness
- Before: 61%After: 78%
- Scrap rate
- Before: 8.4%After: 3.1%
- Changeover time
- Before: 42 minAfter: 18 min